Deliver 7 District Hospitals Including those at Dodowa, Sekondi, Fomena and Garu-Tempane
DESIGN, CONSTRUCTION AND EQUIPPING OF 7 DISTRICT HOSPITALS AND INTEGRATED IT SYSTEMS IN GHANA
This project which, is currently on going is a turnkey arrangement with Messrs NMS Infrastructure and Barclays Bank Plc, London at an estimated cost of US$175,000,000.00
The beneficiary communities are listed below;
- Sekondi Takoradi Municipality
- Abetifi District
- Garu District
- Kumawu District
- Fomena District
- Dodowa District
Construction has commenced in earnest at Dodowa in the Greater Accra Region. Progress stands at about 92% at Dodowa, 60% at Fomena, 45% at Kumawu, 30% at Abetifi. Takoradi European is at 25% complete. All conditions precedent has been fulfilled apart from tax exemption.
The Sekondi site, which has had several challenges, has been handed over to the contractor who is currently conducting topographical survey. The original site offered was rejected due to its closeness to the main gas pipeline from Atuabo.